Automation Showcase – Introducing Our New High Tech Level Stapler

This machine efficiently attaches a level to a cardboard backing, perfect for showcasing products in a retail setting. In order to accomplish this, this machine…

Automatic Conveyor System for an Assembly Line

This is the final testing for our conveyor system. The customer uses this conveyor system as a assembly line for their air conditioner product. In…

Vertical Diverter

This system is a vertical diverter. The vertical diverter is a challenging control issue in that the diverter can only move so as not to…

New Pasteurizers

Prime Control Systems is finishing up the final FAT (Factory Acceptance Test) for two pasteurizers going to Canada.  The system is controlled by Allen Bradley…

Smart Belt

Here is our latest project. This system takes frozen pizza crusts from the bakery and places them on the cardboard for final pizza assembly. This…

Magnetic Separator

One of many foundry projects… This is a magnet (or mag) separator. It removes large and fine metal particles from sand so that the sand…

Latest Generation Pizza Crust Stacker

This is a pizza crust stacker for a large pizza manufacturer. It can stack up to 120 crusts per minute per line and there are…

Jet Melter – A New Way To Automate

Our Jet Melter is equipped with state-of-the-art technology to ensure efficient and precise melting of metal. The Mitsubishi PLC and HMI allow for easy monitoring…

Two Lane Converger

It’s Pizza Time! Our latest project at Nations Pizza. A two lane pizza merge conveyor which keeps the pizzas moving without crashing. Thanks Jim for…

New Metal Charge

The first metal charge for our latest furnace controls. This system can lift up to 1800 pounds of metal 25 ft in the air into…

New Jet Melter Furnace

Finishing up our latest project. This is the automated charging system for an 8000 lb/hour jet melter furnace. Aluminum scrap comes from the left and…

Latest Brewhouse Project

One of our latest brewhouse project. We pre-test our systems as much as possible before they get shipped out. The system being tested is the…

New Control Panel

Checking out our latest control panel. It controls 4 large burners and an 8000 pound per hour metal charging system.